在不良地质条件下的隧道掘进
资料介绍:
在不良地质条件下的隧道掘进 (中文5000字,英文1000字)
摘要
本篇论文所探讨的内容是:在遇到严重减小掘进速度的不良地质条件下的隧道开挖,并提出采用TBM,钻爆法和其他所谓的传统开挖方法进行隧道掘进时所能遇到的问题。下面是由TBM进行掘进的有关机器选型和尺寸的说明,关注于使用TBM进行掘进的地质条件的限制及地质和地质观测的重要性,所以,要恰当理解隧道沿线的围岩状况。讨论集中于相对重要或不良地质状况的围岩,其中包括可挖性限制,开挖洞壁的不稳定性,开挖掌子面的不稳定性,断层和挤压岩况。利用其他作者之言并基于工程经验,通过实例阐述观点,借此机会强调面临的特殊困难并给出建议。
CONDITION
ABSTRACT
[版权所有:http://DOC163.com]
This paper is to discuss TBM tunneling in difficult ground conditions, when problems are met which may reduce dramatically the average progress rates and practical consequences may be such as to pose serious questions on the use of mechanized TBM tunnelling versus drill blast and other so-called traditional excavation methods. Following a few remarks on rock TBM tunnelling in relation to the selection and dimensioning of the machine, the attention is posed on the limiting geological conditions which may be envisaged with respect to the use of TBM tunnelling and on the importance of geological and geotechnical investigations, in order to derive an appropriate understanding of the rock mass conditions along the line of the tunnel. The discussion is centered upon the relatively more important or difficult ground conditions including borability limits, instability of excavation walls, instability of excavation face, fault zones and squeezing. Whenever available to the authors and based on project experience, the point of view is illustrated by case examples, which give the opportunity to underline specific difficulties encountered and recommendations.
[资料来源:http://www.doc163.com]